Eglinton Crosstown TBMs On the Move

Over this weekend, the west-end TBMs for the Eglinton Crosstown LRT line were lifted out of their extraction shaft on the west side of the Spadina Subway Line at Eglinton West Station, and moved a short distance above ground to a launch shaft east of the subway line.

Early Saturday morning, the first of the two TBMs heading east, named Dennis, made this journey. On Saturday, the second TBM, named Lea, was hoisted out of the extraction shaft and began its move to the east side of the subway line.

Here are three photos of Dennis taken around 2 am Saturday morning where it is in place east of the subway line being prepared for lowering:

Dennis viewed from just east of the launch shaft

Dennis viewed from its south side at the launch shaft

Dennis viewed from just west of the launch shaft

 

Here are four photos of Lea taken around 2 am Sunday morning where it is in place east of the subway line and being lowered:

Lea viewed from just east of the launch shaft

Lea viewed from just west of the launch shaft, still being shifted into place for lowering

Lea viewed from just west of the launch shaft as it is in place and about to be lowered

Lea viewed from just west of the launch shaft as it is being lowered

Leave a Reply

authimage